Work out your slab with the concrete calculator
Thickness by use
| Slab | Thickness | Source |
|---|---|---|
| Patio, sidewalk or walkway | at least 4 in | Quikrete; Sakrete |
| Driveway, passenger cars | 4 in | Quikrete |
| Driveway, trucks and heavy vehicles | 5 in to 6 in | Quikrete |
| Small slabs and bases (shed, equipment pad) | 4 in to 6 in, by the load | Quikrete |
| Concrete floor slab (building code minimum) | 3 1/2 in | International Residential Code R506.1 |
Quikrete's FAQ calls the height of a 2 × 4 (about 3 1/2 in) the normal thickness and warns that thinner sections crack too easily; its sidewalk guide and Sakrete's data sheets ask for at least 4 in. The calculator starts at 4 in and warns below 3 1/2 in. Bagged concrete mix is made for pours at least 2 in thick; for anything thinner, use a product made for thin toppings.
How thickness changes what you buy
Volume is area × thickness, so an extra inch on a 4 in slab adds a quarter more concrete. For every 100 sq ft:
| Thickness | Per 100 sq ft | 80 lb bags |
|---|---|---|
| 3 1/2 in | 1.08 cu yd | 49 bags |
| 4 in | 1.23 cu yd | 56 bags |
| 5 in | 1.54 cu yd | 70 bags |
| 6 in | 1.85 cu yd | 84 bags |
Worked example
Driveway 12 × 40 ft, 6 in thick, 10% waste
| Area | 480 sq ft |
|---|---|
| Thickness | 6 in |
| Volume (area × thickness) | 8.89 cu yd |
| Waste allowance | 10% |
| Concrete to buy | 9.78 cu yd |
| Ready-mix order, rounded up | 10 cu yd |
| 40 lb bags, rounded up | 880 bags |
| 60 lb bags, rounded up | 587 bags |
| 80 lb bags, rounded up | 440 bags |
Answer: 9.78 cu yd with waste, so order 10 cu yd of ready-mix or 440 bags of 80 lb mix. Bags are rounded up to whole bags, and ready-mix to the next half yard.
Under and around the slab
- Gravel base. Sakrete says to dig deep enough for the gravel and at least 4 in of concrete. The gravel calculator works out the base.
- Slope. Quikrete recommends about ¼ in of fall per foot so water runs off, but check local codes and conditions.
- Local codes. Garage floors, house slabs and anything carrying a building follow your local code, which can ask for more than these figures.
Common mistakes
- Measuring the forms, not the ground. Low spots under the forms make the slab thicker there and use more concrete than planned. Level the base first.
- Going thin to save money. Thin slabs crack. Saving an inch saves a quarter of the concrete but can cost the whole slab.
Related tools and guides
- CalculatorConcrete CalculatorWork out the concrete for a slab, footings, post holes or steps: cubic yards with waste, the ready-mix order, and how many 40, 60 or 80 lb bags to buy.
- CalculatorGravel CalculatorWork out how much gravel you need for a path, patio or driveway: cubic yards to order, the weight in tons as a range, and how many bags if you buy it bagged.
- GuideHow Many 80 lb Bags of Concrete Are in a Yard?How many 40, 60 and 80 lb bags of concrete make a cubic yard, how to count bags for your pour, and when a ready-mix truck beats bags once fees are counted.