Thickness by use

Recommended concrete slab thickness by use
SlabThicknessSource
Patio, sidewalk or walkwayat least 4 inQuikrete; Sakrete
Driveway, passenger cars4 inQuikrete
Driveway, trucks and heavy vehicles5 in to 6 inQuikrete
Small slabs and bases (shed, equipment pad)4 in to 6 in, by the loadQuikrete
Concrete floor slab (building code minimum)3 1/2 inInternational Residential Code R506.1

Quikrete's FAQ calls the height of a 2 × 4 (about 3 1/2 in) the normal thickness and warns that thinner sections crack too easily; its sidewalk guide and Sakrete's data sheets ask for at least 4 in. The calculator starts at 4 in and warns below 3 1/2 in. Bagged concrete mix is made for pours at least 2 in thick; for anything thinner, use a product made for thin toppings.

How thickness changes what you buy

Volume is area × thickness, so an extra inch on a 4 in slab adds a quarter more concrete. For every 100 sq ft:

Concrete for 100 square feet at each thickness
ThicknessPer 100 sq ft80 lb bags
3 1/2 in1.08 cu yd49 bags
4 in1.23 cu yd56 bags
5 in1.54 cu yd70 bags
6 in1.85 cu yd84 bags

Worked example

Driveway 12 × 40 ft, 6 in thick, 10% waste

Steps for the worked example
Area480 sq ft
Thickness6 in
Volume (area × thickness)8.89 cu yd
Waste allowance10%
Concrete to buy9.78 cu yd
Ready-mix order, rounded up10 cu yd
40 lb bags, rounded up880 bags
60 lb bags, rounded up587 bags
80 lb bags, rounded up440 bags

Answer: 9.78 cu yd with waste, so order 10 cu yd of ready-mix or 440 bags of 80 lb mix. Bags are rounded up to whole bags, and ready-mix to the next half yard.

Calculate your slab

Under and around the slab

  • Gravel base. Sakrete says to dig deep enough for the gravel and at least 4 in of concrete. The gravel calculator works out the base.
  • Slope. Quikrete recommends about ¼ in of fall per foot so water runs off, but check local codes and conditions.
  • Local codes. Garage floors, house slabs and anything carrying a building follow your local code, which can ask for more than these figures.

Common mistakes

  • Measuring the forms, not the ground. Low spots under the forms make the slab thicker there and use more concrete than planned. Level the base first.
  • Going thin to save money. Thin slabs crack. Saving an inch saves a quarter of the concrete but can cost the whole slab.