Concrete Calculator
Work out the concrete for a slab, footings, post holes or steps: the cubic yards to order with waste, or how many 40, 60 or 80 lb bags of mix to buy.
Round bed or odd shape? Choose “Other shape”.
4 in for patios, walks and car driveways; 5 to 6 in for trucks.
4 to 10% is usual. Use more for uneven ground.
Printed on the bag. Adds your mix to the bag counts.
Concrete to buy, with waste
Enter your measurements to see a result.
Slab with curves or a cutout? Measure it with the square footage calculator, then choose “I know the area” above. Not sure how thick it should be? See concrete slab thickness.
Worked example
Patio slab 10 × 10 ft, 4 in thick, 10% waste
| Area | 100 sq ft |
|---|---|
| Thickness | 4 in |
| Volume (area × thickness) | 1.23 cu yd |
| Waste allowance | 10% |
| Concrete to buy | 1.36 cu yd |
| Ready-mix order, rounded up | 1.5 cu yd |
| 40 lb bags, rounded up | 123 bags |
| 60 lb bags, rounded up | 82 bags |
| 80 lb bags, rounded up | 62 bags |
Answer: 1.36 cu yd with waste, so order 1.5 cu yd of ready-mix or 62 bags of 80 lb mix. Bags are rounded up to whole bags, and ready-mix to the next half yard.
Formula and method
slab = area × thickness
footings = length × width × depth × number of footings
post holes or tubes = π × (diameter ÷ 2)² × depth × number of holes (each hole filled completely)
steps = width × run × rise × (1 + 2 + … + (risers − 1)) + width × top depth × rise × risers
to buy = volume × (1 + waste), then bags = ⌈ to buy ÷ yield per bag ⌉
Solid steps are counted as stacked blocks. You enter the risers: every step up, including the one onto the top. The treads below the top are stacked blocks, the bottom one rise tall, the next two rises, and so on, each one run deep. At the top, either a new top step or landing is poured at the full height, as deep as you enter (a plain top step is one tread deep), or the top riser meets an existing porch or sill and nothing is poured there. Post holes and tubes are filled completely: the post isn't subtracted. For fence posts, the fence calculator subtracts the post and the gravel under it. Every measurement is converted to the same unit before multiplying, and nothing is rounded until the purchase: bags are rounded up to whole bags and ready-mix up to the next half yard.
Defaults and where they come from
| Setting | Default |
|---|---|
| Yield of a 40, 60 and 80 lb bag | 0.3 cu ft, 0.45 cu ft, 0.6 cu ft |
| Waste allowance | 10% |
| Ready-mix ordering step | 0.5 cu yd |
| Slab thickness | 4 in |
| Smallest footing (building code) | 12 in wide × 6 in thick |
| Steps (building code) | rise up to 7 3/4 in, tread at least 10 in |
Bag yields are from the Quikrete Concrete Mix and Sakrete High-Strength Concrete Mix data sheets, which agree; other mixes differ, so enter your bag's yield if it isn't one of these. The waste default follows the ready-mix industry (NRMCA advises ordering 4 to 10% more than the measured volume) and Sakrete (add 10%). Some ready-mix suppliers sell in half-yard steps and charge a short-load fee on small orders, so ask yours. Footing and step limits are the minimums in the International Residential Code; your local code may ask for more.
Common mistakes
- Mixing feet and inches. A 4 in slab is a third of a foot. Typing 4 as feet makes the order twelve times too big, so the calculator takes the thickness in inches: check the unit beside the field before you order.
- Skipping the waste allowance. Ground that is a little low, forms that bulge and spillage all use concrete. NRMCA notes that a slab just 1/8 in thicker than planned, on a 4 in slab, needs about 3% more.
- Rounding bags down. Running short in the middle of a pour is hard to fix. Buy the rounded-up count.
- Forgetting the base. Slabs sit on a compacted gravel base; dig deep enough for both. The gravel calculator works out the base.
Frequently asked questions
How many bags of concrete do I need?
Divide the volume in cubic feet by the bag's yield and round up. A 10 × 10 ft slab, 4 in thick, with 10% waste, takes 62 bags of 80 lb mix or 82 bags of 60 lb mix.
Should I buy bags or order a ready-mix truck?
The calculator shows both the bag count for each bag size and the ready-mix order; how many bags make a yard, and when a truck is cheaper helps you choose.
How much concrete for footings or fence posts?
Choose “Footings” or “Post holes or tubes” above; holes are counted full, with no post subtracted. How much concrete for footings, post holes and steps covers measuring and the code minimums.
Related tools and guides
- CalculatorCubic Yard CalculatorConvert any area and depth into cubic yards, cubic feet and cubic meters: rectangles, circles and odd shapes, in feet and inches or metric, for any material.
- CalculatorGravel CalculatorWork out how much gravel you need for a path, patio or driveway: cubic yards to order, the weight in tons as a range, and how many bags if you buy it bagged.
- CalculatorSquare footage calculatorFind the square footage of any room: rectangles, L-shapes, circles and odd shapes, in feet and inches or metric, with cutouts subtracted. Free and private.
- GuideHow Many 80 lb Bags of Concrete Are in a Yard?How many 40, 60 and 80 lb bags of concrete make a cubic yard, how to count bags for your pour, and when a ready-mix truck beats bags once fees are counted.
- GuideHow Thick Should a Concrete Slab Be?Recommended concrete slab thickness for patios, walkways, driveways and shed bases, the code minimum for floors, and how each extra inch changes what you buy.
- GuideHow Much Concrete for Footings, Post Holes and StepsHow to measure footings, post holes, tubes and steps for concrete, the code minimums for footings and stairs, and how many bags each one takes, step by step.