Work out footings, posts or steps with the concrete calculator
Footings
Measure each footing's length, width and depth. For a wall footing, the length is the total run around the wall; for square pads, measure one and count them. The International Residential Code (R403.1.1) sets the smallest concrete footing at 12 in wide and 6 in thick, and its tables ask for wider footings for heavier houses on weaker soil (for example, 19 in wide for two stories over a basement on the weakest soil class).
Exterior footings go at least 1 ft below undisturbed ground and below the frost line your local code sets (R403.1.4). Small detached sheds can be exempt. Your building department has the frost depth for your area and the final word on footing sizes.
Worked example
Wall footing 20 ft long, 12 in wide, 6 in deep, 10% waste
| One footing (length × width × depth) | 0.37 cu yd |
|---|---|
| All footings | 0.37 cu yd |
| Waste allowance | 10% |
| Concrete to buy | 0.41 cu yd |
| Ready-mix order, rounded up | 0.5 cu yd |
| 40 lb bags, rounded up | 37 bags |
| 60 lb bags, rounded up | 25 bags |
| 80 lb bags, rounded up | 19 bags |
Answer: 0.41 cu yd with waste, so order 0.5 cu yd of ready-mix or 19 bags of 80 lb mix. Bags are rounded up to whole bags, and ready-mix to the next half yard.
Post holes and tubes
A round hole or form tube holds π × (diameter ÷ 2)² × depth. Quikrete suggests a post hole about three times the post's width, and about a third of the post's full length deep. Form tubes are sold in 8 in, 10 in and 12 in diameters (QUIK-TUBE), and also 6 in (Sonotube). Bags per tube, with no waste:
| Diameter | 1 ft deep | 2 ft deep | 3 ft deep | 4 ft deep |
|---|---|---|---|---|
| 6 in | 1 × 60 lb or 1 × 80 lb | 1 × 60 lb or 1 × 80 lb | 2 × 60 lb or 1 × 80 lb | 2 × 60 lb or 2 × 80 lb |
| 8 in | 1 × 60 lb or 1 × 80 lb | 2 × 60 lb or 2 × 80 lb | 3 × 60 lb or 2 × 80 lb | 4 × 60 lb or 3 × 80 lb |
| 10 in | 2 × 60 lb or 1 × 80 lb | 3 × 60 lb or 2 × 80 lb | 4 × 60 lb or 3 × 80 lb | 5 × 60 lb or 4 × 80 lb |
| 12 in | 2 × 60 lb or 2 × 80 lb | 4 × 60 lb or 3 × 80 lb | 6 × 60 lb or 4 × 80 lb | 7 × 60 lb or 6 × 80 lb |
These counts match Quikrete's own QUIK-TUBE table. For load-bearing posts and deck piers, follow your local code. Setting fence posts? How far apart they go and how deep the holes are dug for your frost line are covered in fence post spacing and depth.
Worked example
Ten post holes 9 in across, 30 in deep, no waste
| One hole or tube (π × radius² × depth) | 0.04 cu yd |
|---|---|
| All holes or tubes | 0.41 cu yd |
| Waste allowance | 0% |
| Concrete to buy | 0.41 cu yd |
| Ready-mix order, rounded up | 0.5 cu yd |
| 40 lb bags, rounded up | 37 bags |
| 60 lb bags, rounded up | 25 bags |
| 80 lb bags, rounded up | 19 bags |
Answer: 0.41 cu yd with waste, so order 0.5 cu yd of ready-mix or 19 bags of 80 lb mix. Bags are rounded up to whole bags, and ready-mix to the next half yard.
Steps
Count the risers: every step up, including the one onto the top. Solid concrete steps are counted as stacked blocks: the bottom tread is one rise tall, the next two rises, and so on, each one tread deep and the full width. A new top step or landing is the full height of the steps (a plain top step is one tread deep); if the top riser meets an existing porch or sill, nothing is poured at the top.
- Rise and tread. The code allows a riser of up to 7 3/4 in and treads at least 10 in deep, the same on every step of a flight. Quikrete pairs lower risers with deeper treads: a 7 in to 7 1/2 in rise with a 10 in to 11 in tread, or a 6 in to 6 1/2 in rise with a 14 in to 15 in tread.
- Width. Quikrete says home steps are usually 48 in wide, or at least as wide as the door and walk they serve.
- Landings. Quikrete recommends landings at least 3 ft deep.
Worked example
Three steps 4 ft wide, 7 in rise, 11 in run, top step one tread deep, 10% waste
| Treads below the top (solid, to the ground) | 0.24 cu yd |
|---|---|
| Top step or landing (solid, to the ground) | 0.24 cu yd |
| Total | 0.48 cu yd |
| Waste allowance | 10% |
| Concrete to buy | 0.52 cu yd |
| Ready-mix order, rounded up | 1 cu yd |
| 40 lb bags, rounded up | 48 bags |
| 60 lb bags, rounded up | 32 bags |
| 80 lb bags, rounded up | 24 bags |
Answer: 0.52 cu yd with waste, so order 1 cu yd of ready-mix or 24 bags of 80 lb mix. Bags are rounded up to whole bags, and ready-mix to the next half yard.
Common mistakes
- Measuring post holes at the top only. Holes are often wider at the top or the bottom. Measure the average diameter, or use a form tube for an exact size.
- Uneven steps. Codes allow no more than 3/8 in difference between the tallest and shortest riser in a flight. Plan the rise before building forms.
- Footings above the frost line. The code doesn't allow footings on soil that freezes. Check the frost depth with your building department before digging.
Related tools and guides
- CalculatorConcrete CalculatorWork out the concrete for a slab, footings, post holes or steps: cubic yards with waste, the ready-mix order, and how many 40, 60 or 80 lb bags to buy.
- GuideHow Many 80 lb Bags of Concrete Are in a Yard?How many 40, 60 and 80 lb bags of concrete make a cubic yard, how to count bags for your pour, and when a ready-mix truck beats bags once fees are counted.
- GuideHow Far Apart Should Fence Posts Be, and How Deep?How far apart to set fence posts, how deep and wide to dig the holes, how much gravel and concrete each post takes, and how many posts your fence needs.